Projects






City of Hoquiam – Train Station Restoration

Built in 1914, this station served as a terminus for three transcontinental railroads, but saw its last paying passenger in 1955.  The Train Station Renovation was completed in 2008.  The project consisted of restoration and matching of original wall, wood work, windows and updating of plumbing and electrical while maintaining period architecture.

More Details

Dept. of Natural Resources – Webster Nursery Greenhouse and Chemical Mix Building

This project included site work and underground utilities for an automated Greenhouse with an aluminum-framed structure.  This Greenhouse has an interior watering and chemical feed system and two large generators designed specifically for nursery applications.

More Details










Westport Shipyard

Lamination Building (#9) is a 54,000 square foot design built steel building with 40 foot side walls for a Ship hull fiber glassing building.  Building #2 is a remodel and reconfiguration of a 19,000 square foot building with a Small Parts Paint Room, Small Parts Lamination Room, Resin Room, and a Mechanical Room with mezzanines.  Other projects included Yard Restoration, Underground Utility Improvements, Building #7 Mezzanines, Office Renovations, Nyhus Street and Yard Drainage.

More Details

Polson Museum – Locomotive Shop

This addition to the Polson Museum complex has extensive site work and excavation, including step footings and storm water drainage.  This recreation of a turn-of-the-century Locomotive Shop and Donkey Shed is being built with current IBC standards.  The structure’s framing is a combination of metal and timbers to create the appearance of yesteryear while maintaining current safety standards.

More Details




WA DOT – Maytown & Scatter Creek Safety Rest Areas

Three masonry block utility buildings and a series of underground vaults to support the new sewer system for the rest areas. Project also required the demolition and reconstruction of sidewalks and floors in exiting restrooms.

More Details

Grays Harbor County PUD #1 – Storage Facility

A 4,608 square foot wood-framed Storage Building with metal roof and siding used to house various PUD maintenance equipment.

More Details

Sumner Medical Properties – Coastal Internal

Site stabilization, underground utilities, and a massive foundation with retaining wall highlight the special requirements needed to construct this wood-framed building to house multiple physicians.

More Details

Grays Harbor County Public Department Authority – Satsop Spec Building – Site Civil

Construction of a 50,000 square foot light industrial building.  Heavy-duty electrical, natural gas, water, sewer and telecommunication lines, parking lot with full-length loading docks, roll-up doors and 20’ ceiling height at the eaves.

More Details

Grays Harbor County – Muller Road Slide Repair

Emergency Slide Repair where traffic control was utilized for safety.  Heavy equipment and trucks loaded with large Rip Rap were used to fill and stabilize the area.  The project was completed quickly and safely under adverse weather conditions.

More Details

Customer Referrals

City of Aberdeen – October, 2007

As the Direct of Parks and Recreation for the City of Aberdeen, I would like to thank Bowers Construction for the fine work you did on our Finch Playfield remodel project. The crew worked well with our staff to coordinate schedules, completed the job on time, and did a great job of providing us with a finished product.

Thanks again,

Karl Harris

Director, Aberdeen Parks and Recreation

Ducks Unlimited, Willapa River Wetland Restoration Project – October, 2007

Dear Jeff,

On behalf of Ducks Unlimited, I would like to thank you and your staff for the fine work done on the (Willapa River Wetland Restoration Project)…..As you know, the site conditions were less than ideal much of the time, and the timeline with which we had to complete the project left no room for a lack of production.  Thankfully, and despite an unusually wet summer, the crew’s hard work, professionalism, responsiveness and willingness to deal with the adverse weather and changing site conditions resulted in the project being completed on time.

I would recommend Bowers Construction to anyone who asks, and I look forward to working with your company again in the near future.

Sincerely,
Ducks Unlimited, Inc.

Steve Liske, P.E.
Senior Regional Engineer

Grays Harbor County – Grays Harbor Raceway Grandstand Tower Project, 2003

Dear Jeff,

On February 24, 2003, Grays Harbor County opened bids for our Grandstand Tower project.  Your firm was low bidder and Notice to Proceed was issued on March 5, 2003.  The project consisted of reconstruction of the Grandstand Tower, a two-story structure with retail sales below and viewing, announcing, and press box areas on the upper level.

The project was completed and accepted by the County on May 8, 2003.  Three (3) owner-requested change orders for additional work were approved during construction.

The project was completed on time with a very short construction schedule for which the County and our race track promoter, Brownfield Promotions, were very appreciative, as the project was completed before the start of racing that spring.

The project is now three (3) years old and is functioning well.  It is the centerpiece of the Raceway.

Grays Harbor County is very pleased with the facility and appreciates the efforts and workmanship by Bowers Construction on this project.

Sincerely,

Kevin Varness
Director of Utilities and Development